Which companies run the phosphate mines in southeast Idaho?
East of Soda Springs, most Idaho phosphate mining takes place. J.R. Simplot Co., Bayer (through its P4 Production subsidiary) and Itafos at Conda run most of the operations. Phosphate goes into fertilizer and elemental phosphorus, and southeast Idaho supplies a large share of what American farms use. Southeast Idaho produces up to 30 percent of the country's phosphate, according to the Bureau of Land Management.
The industry goes back decades. The New York Times, in a 2006 look at what the industry calls the phosphate patch, described phosphate mining in Idaho dating to at least the 1950s. A Montana Tech program overview lists the historic operators under federal phosphate leases: Monsanto, which is now Bayer's P4 Production; Agrium's Nu-West operations at Conda; J.R. Simplot; FMC (Astaris); and Solvay (Rhodia).
The mines feed two kinds of plants. P4's facility near Soda Springs makes elemental phosphorus, and the Simplot and Conda operations make fertilizer products.
How many jobs does phosphate mining support in Idaho?
The industry's payroll numbers come from the operators' own trade association. Citing 2022 Idaho Mining Association figures, the Southeast Idaho Phosphate Resource Area fact sheet estimates phosphate mining and manufacturing directly supported 1,439 industry jobs. Payroll and benefits totaled $162 million, and gross state product was about $714 million. Mining royalties and taxes also send millions to the state for education and local programs.
P4 Production submitted the mine plan for its newest project, the Caldwell Canyon Mine, on Schmid Ridge, about 14 miles northeast of Soda Springs. In October 2025 the BLM approved the mine plan. The agency expects roughly 800 jobs. Federal lease royalties are expected to exceed $80 million over the mine's life, and the mine can supply P4's Soda Springs plant for about 40 years.
| Operator | Mine or facility | Role |
|---|---|---|
| Bayer (P4 Production) | Caldwell Canyon, Blackfoot Bridge mines; Soda Springs plant | Elemental phosphorus |
| J.R. Simplot Co. | Smoky Canyon, Woodall Mountain (Conda) | Fertilizer products |
| Itafos | Conda phosphate operations | Fertilizer products |
Caldwell Canyon also matters for continuity. The BLM says it will let P4 adjust as the existing Blackfoot Bridge Mine is depleted, which is why the approval landed as good news in Soda Springs.
What permits does a new phosphate mine need in Idaho?
Phosphate is a leasable mineral under the Mineral Leasing Act of 1920, which means the federal government, through the BLM, controls access to ore on public land. A company needs federal leases and an approved mine plan, and the plan has to clear an Environmental Impact Statement before the BLM signs a Record of Decision.
Caldwell Canyon shows how long that takes. A U.S. District Court vacated the 2019 approval of the original project in June 2023, and P4 submitted a revised mine plan that September, with another revision in January 2024. The draft EIS came out in December 2024, and the BLM issued the new Record of Decision in October 2025. State oversight runs alongside: the Idaho Department of Environmental Quality tracks mine investigations and cleanup across the Southern Idaho Phosphate Resource Area.
How is selenium from old phosphate mines being cleaned up?
The cleanup burden is the industry's oldest problem. Overburden, the rock removed to reach ore, can hold selenium and other metals. As the rock weathers, those metals can wash into streams and groundwater, as DEQ explains. The damage is documented: a 2006 New York Times report found all but one of the region's 23 mines had been declared Superfund sites for leaching selenium, and a letter to Chemical & Engineering News cited a steady toll of sheep, horse and cattle deaths from selenium poisoning in the area.
The Ballard Mine shows what a fix costs. Monsanto mined phosphate at the Ballard site from 1951 to 1969, leaving about 19 million cubic yards of waste rock containing selenium, arsenic and uranium. The EPA issued its final cleanup plan for the 534-acre site, 13 miles north of Soda Springs. The plan calls for filling the pits and building a cover system five to six feet thick over more than 500 acres, plus permeable reactive barriers to treat contaminated groundwater. The EPA's final plan sets out a remedy that includes a cover system five to six feet thick over the mine pits and permeable reactive barriers to treat contaminated groundwater.
P4 intends to recover ore still at Ballard while the remedy is built, which the EPA says may lower cleanup costs, and the company will keep using the 10-acre shop area for mining and remedy work until a final plan for that parcel is approved.
How phosphate mining affects Idaho workers and employers
Mines that run for decades support jobs in equipment and maintenance at plants in Caribou and Bear Lake counties. The 2022 figures include 1,439 direct jobs and $162 million in payroll, largely in small southeast Idaho towns. Per the BLM, Caldwell Canyon is expected to bring roughly 800 jobs and supply the Soda Springs plant for about 40 years.
For employers outside the mines, the connection runs through fertilizer. Processing projects in the area have drawn the same kind of scrutiny the mines get. When ConAgra dropped its appeal of a clean air permit for the proposed Magnida nitrogen fertilizer plant near American Falls in 2014, the company's president credited Gov. Butch Otter's involvement in working out the "difficult details," according to Capital Press reporter John O'Connell. That episode and the court fight over Caldwell Canyon show how neighbors, agencies and courts can shape timelines in the phosphate patch.